c

7 Line Extension Project

Major Facets

Two tunnels 22-feet in diameter.


Construction of an underground station at 34th Street.


Excavation utilizing hard-rock TBMs, drill-and-blast, close-in blasting, extensive mechanical rock excavation and ground freezing.


Lowering of the existing track bed by nearly seven feet.


Project was completed five months ahead of schedule.

Search or filter all our projects

Results

loading