D52 Repair of rest area km 10.5 Rajhrad L+ R

  • Rajhrad right rest area
  • Rajhrad right rest area
  • Whitetopping laying
  • Whitetopping laying

On the left rest area of the D52 Rajhrad we used a unique repair technology using a thin concrete layer called Whitetopping and at the same time we used our own newly developed asphalt mix ResiSkan, highly resistant to permanent deformation and frost cracking. Over a four-month period, we reconstructed the sewers at both rest areas, including two oil separators, reconstructed the public lighting and made new concrete and bituminous surfaces, including road markings.

Whitetopping area: 2652 m²

ResiSkan area: 2486 m²